South Road, Hampton East
Building Type: Residential Development
Construction Cost: 3 Million AUD
Project Completion: 2014
Services Provided By MEC: Structural Design, Stormwater Design & Soil Report.
Project Summary:
This project involved the construction of 10 apartments with an underground basement car park. Melbourne Engineering Consultants involvement in this project included the structural
design of the super structure including basement retention, footings and a combination of
suspended concrete and light-weight floors with tiled roofs. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles.
Carrington Road, Box Hill
Building Type: Residential Development
Construction Cost: 7 Million AUD
Project Completion: 2014
Services Provided By MEC: Structural Design,
Stormwater Design & Soil Report.
Project Summary:
This project involved the construction of 25 apartments with an underground basement car park. Melbourne Engineering Consultants involvement in this project included the structural
design of the super structure including basement retention, footings, and a combination of
suspended concrete and light-weight floors with metal roofs. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles.
Gardenvale Road, Gardenvale
Building Type: Residential Development
Construction Cost: 1.5 Million AUD
Project Completion: 2013
Services Provided By MEC: Structural Design,
Stormwater Design & Soil Report.
Project Summary:
This project involved the construction of two large 2 storey dwellings in the prestigious area of Gardenvale. Melbourne Engineering Consultants involvement in this project included the structural design of the super structure including slab and footings, light-weight floors and metal roofs. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system.
Grange Road, Ormond
Building Type: Residential Development
Construction Cost: 3.5 Million AUD
Project Completion: 2014
Services Provided By MEC: Structural Design, Civil Design, Stormwater Design & Soil Report.
Project Summary:
This project involved the construction of 13 apartments with an underground basement car park. Melbourne Engineering Consultants involvement in this project included the structural
design of the super structure including basement retention, footings and a combination of suspended concrete and light-weight floors with tiled roofs. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles.
Bright Street, Brighton East
Building Type: Residential Development
Construction Cost: 1.8 Million AUD
Project Completion: 2014
Services Provided By MEC: Structural Design, Civil Design, Stormwater Design.
Project Summary:
This project involved the construction of 3 luxury townhouses with an underground basement car park for six cars. Melbourne Engineering Consultants involvement in this project included the structural design of the structure including basement retention, footings and a combination of suspended concrete and light-weight floors with tiled roofs. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles.
Aubrey Grove, Boronia
Building Type: Residential Development
Construction Cost: 1.2 Million AUD
Project Completion: 2013
Services Provided By MEC: Structural Design, Civil Design, Stormwater .
Project Summary:
This project involved the construction of 3 town houses. Melbourne Engineering Consultants involvement in this project included the structural and stormwater drainage design incorporating water sensitive design principles.
Grange Road, Ormond
Building Type: Residential Development
Construction Cost: 3.5 Million AUD
Project Design: 2013
Currently under construction
Services Provided By MEC: Structural Design, Civil Design, Stormwater Design & Soil Report.
Project Summary:
This project involved the construction of 13 apartments with an underground basement car park. Melbourne Engineering Consultants involvement in this project included the structural
design of the super structure including basement retention, footings and a combination of suspended concrete and light-weight floors with tiled roofs. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles.
Watt Street, Springvale
Building Type: Residential Development
Construction Cost: 1.8 Million AUD
Project Completion: 2015
Services Provided By MEC: Structural Design, Civil Design, Stormwater Design .
Project Summary:
This project involved the construction of 9 two storey units with a common underground basement car park. Melbourne Engineering Consultants involvement in this project included the structural design of the super structure including basement retention, footings and a combination of suspended concrete and light-weight floors with metal roof. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles
Glenhuntly Road Caulfield
Building Type: Residential Development
Construction Cost: 2.0 Million AUD
Project Design Completion: 2015
Services Provided By MEC: Structural Design, Civil Design, Stormwater Design.
Project Summary:
This project involved the construction of 5 apartments with an underground basement car park and commercial facility. Melbourne Engineering Consultants involvement in this project included the structural design of the super structure including basement retention, footings and a combination of suspended concrete and light-weight floors with metal roof. Melbourne Engineering Consultants was also responsible for the design of the Stormwater Drainage system incorporating water sensitive design principles.
Rose St Highett
Building Type: Residential Development
Construction Cost: 1.5 Million AUD
Project Completion: 2013
Services Provided By MEC: Structural Design, Stormwater Design.
Project Summary:
This project involved the construction of two 2 storey dwellings with in-ground pools in a Bayside suburb of Highett. Melbourne Engineering Consultants involvement in this project included the structural design of the dwellings and the Stormwater Drainage system incorporating WSUD principles